Count boards before you buy
Picket fence calculator
Calculate wood pickets, rails and posts from your fence length and the gap you want. Use actual board width; the nominal lumber size can be different.
Fence estimate – picketcalc.com
Your estimate
150 ft · 4 ft tall · Wood
Material list
- Posts 6 ft minimum (height + embedment)
- 20
- Rails ≈7.9 ft each, 2 per bay
- 42
- Pickets 3.5 in wide, 2 in gap
- 377
- Concrete bags 50 lb, rounded per hole
- 60
- Fence area one side, sq ft
- 600
Includes 10% extra on pickets, rails and fabric
0 × 50 ft fabric rolls
Planning quantities, excluding special hardware. Confirm the layout before ordering.
Fence layout
- End posts 2
- Corner posts 0
- Line posts 18
- Gate posts 0
Each side uses the same scale. Shared corner posts appear on both adjoining rows and count once. Gates split each side into equal runs; each run uses equal bays no wider than your post spacing.
Get the gap and bay layout right
A narrower gap uses more pickets. This tool rounds up each bay separately, so you can trim the final picket or adjust the end gaps when laying out a bay. Use the waste allowance to reserve extra boards for cuts or damaged pieces.
Subtract the openings, then plan the gates separately
Total length includes the gate openings. The calculator removes those openings from the picket and rail runs and adds posts at the gate boundaries. Gate infill, hinges, latches and bracing need their own list. Corners share posts between adjoining sides. If several gates share posts, draw that layout before ordering.
Measure board width, gap and the fence route
Measure the face of the picket you intend to buy. Enter that actual width, then enter the clear gap you want between adjacent boards. The gap is measured edge to edge, not center to center. Dry-fit the layout on the proposed bay before fastening boards, because the end spaces and any trimmed picket need to look right at the posts.
Draw each side and mark openings. Measure the whole side including its gates; the calculator subtracts those openings. Choose maximum post spacing that matches the fence design. Shortening that spacing can change the picket total because each bay is rounded separately. A count based only on total footage misses that rounding at the posts.
Worked example: an open picket fence
Use an illustrative 100 ft straight run at 4 ft high, with no gates and 8 ft maximum post spacing. Choose 3.5 in actual board width and a 3.5 in clear gap for this calculation; these are example inputs, not a required product layout. The tool returns 13 equal bays and 14 posts.
Each bay is about 92.31 in long. Adding the gap to that length, then dividing by board width plus gap, gives 13.69 boards before rounding. Round up to 14 per bay, for 201 pickets along the run. The model also returns 29 rail pieces using its rail-row assumption. Rail pieces are not a purchase list until their lengths and connections are checked.
Dimension references: actual picket width and Lowe's spacer example. The spacer guide describes shadowbox construction; this example counts only a single face. The chosen gap is not a code limit or a guarantee of containment.
Why the formula adds a gap before dividing
A row of boards has a gap between neighboring boards, but no extra gap after the final board. Adding a gap to the bay length accounts for that missing last gap when calculating coverage. The tool rounds up to avoid an undercount. A rounded result may require a trimmed end picket or adjusted spacing, so it is not an instruction to fasten full-width boards at exactly the entered gap without laying them out first.
Common counting mistakes
- Entering a nominal lumber size instead of measuring the board face.
- Subtracting a gate by hand, then entering that gate and subtracting it again.
- Dividing the full fence length by board coverage and ignoring separate bays.
- Buying the exact result without checking cuts, damaged boards or the seller's return policy.
- Using the fence-run pickets to cover a gate whose frame and bracing need a separate layout.
Privacy, overlap and horizontal boards
A no-gap, side-by-side wood fence uses board face width as coverage. A board-on-board fence overlaps boards, so face width alone overstates the area each board covers. Calculate that layout from its overlap detail instead of using a negative gap. Horizontal boards need their own support spacing, stock-length and cut plan; this tool counts vertical pickets.
If boards vary in width or you want a symmetrical pattern around the middle of each bay, mark out a trial bay before ordering the final count. The calculator does not reserve an allowance for a decorative pattern, curved top or an overlapping gate face.
Use the board count separately from the cost range
The quantity result describes the open picket layout you entered. The wood cost rate used by this site's main estimator is for privacy fencing, so changing picket width or gap does not produce a matching open-picket price. Take the board, rail and post list to a supplier for a product-specific price, including fasteners and gate parts. Do not infer a picket unit price by dividing a broad privacy budget by this count.
How the quantities are calculated
Gate openings are deducted from each side's length, then the remaining fence on that side is divided into equal runs between gates. Each run uses whole bays no longer than your post spacing. Add bays + gates + 1 for each side, then subtract shared corner posts: one fewer than the number of sides for an open fence, or one per side for a closed loop. Uneven gate positions need a separate layout.
Pickets are rounded up in each bay using (bay length in inches + gap) ÷ (picket width + gap). Rails use two rows through 4 ft high and three rows above 4 ft. Gates are counted as openings; gate-frame lumber and gate pickets are excluded.
Concrete assumes a 12 in hole around a 3.5 in square wood or vinyl post, or an 8 in hole around a 2.375 in round metal post. These are planning assumptions, not product specifications. Concrete depth starts at one-third of the above-ground height, with a separate 6 in gravel base. The 50 lb bag yield is 0.375 cubic feet; each hole is rounded up separately. Use the post depth tool to enter local frost depth and the actual post dimensions.
Fence square footage is net fence length × height for one side. The waste allowance adds extra pickets, rails and fabric, rounded up, without changing posts, panels, concrete or area. Fasteners, caps, tension hardware, gate materials and finish are excluded. Cost ranges use sourced per-foot rates × total entered length, including gate openings, separately from these counts. Matching sourced gate charges are added where available; the result states which gate costs are excluded. Installed rates already include labor.
Concrete reference: QUIKRETE post-setting guide and 50 lb mix yield . Check product instructions and local requirements for the final footing design.
Common questions
How many pickets do I need per bay?
Divide the bay length plus a gap by the actual board width plus that gap, using the same units, then round up. Repeat for each bay and plan the trimmed end or adjusted spacing.
Does a wider gap reduce the board count?
It can, but the result changes in whole boards within each bay. Check the finished spacing against the purpose and requirements of your fence.
Is a waste allowance included?
No. Check the cut layout and board condition with the supplier before deciding how much extra material to order.
Can I use this for a board-on-board fence?
No. Overlap changes effective coverage. Use a takeoff based on the specified overlap and include the gate face separately.